Group B Large DG Block 4 closed

On March 4, 2020 an application was submitted that exceeded the available capacity in Group B Large DG Block 4. This application and all other applications for this Group/category submitted in a paid batch on or prior to 11:59 PM Central Prevailing Time on that date (731.2 kWac) were allocated to Block 4. These applications did not exceed the closing day cap of 5 MW of Block 4 capacity that was previously announced on February 26, 2020. All applications submitted for this Group/category after this date and time will be placed on a waitlist as the Block is now closed. At this time there is not a schedule for the opening of a future block of capacity for Group B Large DG. Please refer to the announcement of the Block 4 closing protocol on illinoisshines.com for more details.