The Illinois Power Agency has released a request for stakeholder feedback on System Design Criteria for Distributed Generation Systems.
The linked document provides background on the request and poses a number of questions for stakeholder input. Responses are requested by May 21, 2021 (extended from the original deadline of May 14, 2021) and instructions for how to respond are included in the document.