Portal Enhancement: NM2-Cleanup – API Call – remove alt validation logic to support old calls.
The Disclosure Form API has been updated to deprecate/remove Rebate_Amount key-value pair on DG Disclosure Forms when creating from the API. When net metering originally went live on January 7, 2025, it included new functionality to calculate the amount of Smart Meter rebates based on a new rebate rate field, but initially the method of supplying an explicit Rebate […]
Portal Enhancement: Part I Application Portal Enhancement: Conditional message on Documents page for expansion and co-location projects (COC|PTO).
A message has been added to the top of the Documents section of Part I Applications for expansion and co-location projects to inform AVs what optional documents are required to apply for exceptions to expansion pricing.
Portal Enhancement: API – Enhanced Validation Error Messaging.
Several validation messages have been returned by the API when an error is observed in three specific fields. This has been updated to more clearly call out the name of the missing attribute and remove double quotes from the error message text, which can cause parsing issues when relaying the message back resulting in a generic “bad […]
Bug Fix: Cannot submit app when interconnecting Utility Changed Between Part 1 and 2 (from ComEd).
Issue: When a Part I project application was originally submitted with the Interconnecting Utility specified as ComEd, but the Interconnecting Utility was later updated/corrected to a different utility company during Part I Verification, submission of the Part II application was being blocked by a validation error requesting to have a Net Metering Letter uploaded in the documents […]
Bug Fix: Net Metering: DG Disclosure Form – “What is the customer’s expected annual electricity usage in kWh?” question seems to blank out/not be saving when users resume an unsubmitted form.
When resuming an existing unsubmitted Disclosure Form, the “What is the customer’s expected annual electricity usage in kWh?” question would occasionally blank out as the editable form page loaded depending on answers in other fields. This was because the field was originally planned to be conditionally required based on the “Customer type” answer, but that was changed […]
Portal Enhancement: DG Disclosure Forms revised to reflect new changes to Net Metering policies effective for 2025.
For more information see the Updated Distributed Generation Disclosure Forms announcement.
Portal Enhancement: Cannot submit Part II application when the question “Does your system have a battery backup?” answer is ‘Yes’ for Part I and ‘No’ for Part II
Previously, when a DG project was planned to have a battery backup in Part I, but the back-up component was removed in Part
Portal Enhancement: Rebate Calculations (Net Metering and Storage) (Web and common flow)
Portal Enhancement: Rebate Calculations (Net Metering and Storage) (Web and common flow) This enhancement provides calculations and new fields on Disclosure Forms in support of net metering changes. The changes include:
Portal Enhancement: Project app: REC estimate does not recalculate when inputs change
This enhancement will combine the PVWatts call and REC Details into the same action. It will also add other functionality that should help prevent errors when revisiting an application’s system details and recalculating the REC Details.
Portal Enhancement: As a Vendor: Forgot Password returns generic error if user cancels password change.
This enhancement removes an error message when the user selects “Forgot Password”, receives an email with a change password link, goes to the link, and then cancels out of the prompt.