Enhancement: Update “meter” to “solar production meter”.
Part II application fields to collect information on the project’s Solar Production Meter were renamed for more clarity:
- “Meter Manufacturer/Make” was renamed to “Solar Production Meter Manufacturer / Make”
- “Meter Model” was renamed to “Solar Production Meter Model”
- “Photograph of the Meter was renamed to “Photograph of the Solar Production Meter”
It is hoped that the increased clarity from the revised names will reduce the number of applications sent to the Needs Info request to recollect meter information.
Bug Fix : DG DF REC Calculator not working for ‘Municipal Utilities’ and ‘Rural Electric Co-Op’s’.
The REC incentive calculator on Disclosure Forms was generating an error when a ‘Municipal Utility’ or a ‘Rural Electric Co-Op’ was selected as the Interconnecting Utility. This has been corrected and the REC incentive payment will now calculate for ‘Municipal Utilities’ and ‘Rural Electric Co-Op’ DG projects.