Uncontracted Capacity Reallocation Process for the 2026-27 Program Year

Illinois Shines features annual blocks of capacity that remain open until block capacity is exhausted for the Program Year, and unused or uncontracted capacity is redistributed after the close of a Program Year. This memo outlines the steps the Agency has taken to reallocate remaining capacity from the 2025-26 Program Year for use in the 2026-27 Program Year.

The process for reallocation followed the steps contained in Section 7.3.4 of the 2024 Long-Term Plan:

  1. First, the Agency allocated any uncontracted capacity to the Small Distributed Generation category waitlist. There were no projects on this waitlist for the 2025-26 Program Year.
  2. Next, the Agency allocated any uncontracted capacity to the Large Distributed Generation category waitlist. There were no projects on this waitlist for the 2025-26 Program Year.
  3. Next, the Agency allocated any uncontracted capacity to the Distributed Generation subcategory of the Equity Eligible Contractor category waitlist. There were no projects on this waitlist for the 2025-26 Program Year.
  4. Next, the Agency allocated any uncontracted capacity to the Distributed Generation subcategory of the Public Schools category waitlist. There were no projects on this waitlist for the 2025-26 Program Year.
  5. Next, the Agency allocated any uncontracted capacity to the Community‐Driven Community Solar waitlist. Eligible waitlisted projects were required to have met the minimum scoring threshold for waitlist placement.
  6. Next, the Agency allocated any uncontracted capacity to the Community Solar subcategory of the Equity Eligible Contractor category waitlist. There were no projects on this waitlist for the 2025-26 Program Year.
  7. Next, the Agency allocated any uncontracted capacity to the Community Solar subcategory of the Public Schools category waitlist. There were no projects on this waitlist for the 2025-26 Program Year.
  8. Uncontracted capacity remained after the above allocations were made. The Agency allocated uncontracted capacity across the remaining Program categories featuring waitlists on a pro rata basis. There was a remaining waitlist for Traditional Community Solar Group A . Capacity was allocated in the amount of this waitlist.
  9. Finally, the remaining uncontracted capacity was distributed across all Program categories on a pro rata basis corresponding with those categories’ Section 1-75(c)(1)(K) percentage allocations.[1]
BlockGroupCategoryTier (Public Schools only)Size kW (Public Schools only)2026-27 Program Year block prior to uncontracted capacity reallocation (MW)2026-27 Program Year final block size (MW)2025-26 Program Year waitlist (MW)2026-27 Program Year opening available capacity (MW)
CEJA CategoryGroup Tier  2026-27 block + reallocated uncontracted 2025-2026 capacity Final block size minus 2025-26 waitlist allocation
Small DGN/ADG  180.00236.710.00236.71
Large DGN/ADG  180.00236.710.00236.71
TCSA (30%)CS  78.00119.5216.00103.52
TCSB (70%)CS  182.00241.540.00241.54
CDCSA (30%)CS  15.0019.250.0019.25
CDCSB (70%)CS  35.0053.408.4844.92
EECA (30%)CS (75%)  49.5055.880.0055.88
DG (25%)  16.5018.630.0018.63
B (70%)CS (75%)  115.50130.390.00130.39
DG (25%)  38.5043.460.0043.46
Public SchoolsN/ACS (25%)Tier 1, 2, and EJC (70%)<250 (25%)4.816.670.006.67
250 – 1000 (50%)9.6313.3513.35
1000-5000 (25%)4.816.676.67
Tier 3, 4 (30%)<250 (25%)2.062.862.86
250 – 1000 (50%)4.135.725.72
1000-5000 (25%)2.062.862.86
DG (75%)Tier 1, 2, and EJC (70%)<250 (25%)14.4420.020.0020.02
250 – 1000 (50%)28.8840.0440.04
1000-5000 (25%)14.4420.0220.02
Tier 3, 4 (30%)<250 (25%)6.198.588.58
250 – 1000 (50%)12.3717.1517.15
1000-5000 (25%)6.188.578.57

[1] Small DG – 20%; Large DG – 20%; TCS – 30%; Public Schools – 15%; CDCS – 5%; EEC – 10%